
|

Photos of Lifting A Race Car Onto A Building



The rigging has been secured to the race car, and it is being lifted.



The crew double checks the rigging to make sure it is secure.



The crew double checks the rigging to make sure it is secure.



A broader view of the work site.



The front of the bowling alley building where the race car will be set.



Tim Nall checks the correct angle of the race car with a level.



The race car will be positioned on top of the building at an angle.



A crew member will hold a guide rope as the race car is lifted.



With everything ready, Tim Nall takes a seat in the crane.



The Lowes # 48 race car is ready to be lifted into position.






|

|

|