Photos of Lifting A Race Car Onto A Building



Previous Page
Page 3-of-7
Next Page

The rigging has been secured to the race car, and it is being lifted.



The crew double checks the rigging to make sure it is secure.



The crew double checks the rigging to make sure it is secure.



A broader view of the work site.



The front of the bowling alley building where the race car will be set.



Tim Nall checks the correct angle of the race car with a level.



The race car will be positioned on top of the building at an angle.



A crew member will hold a guide rope as the race car is lifted.



With everything ready, Tim Nall takes a seat in the crane.



The Lowes # 48 race car is ready to be lifted into position.



Previous Page
Page 3-of-7
Next Page







Home Page | About Us | Contact Us | Auto Repairs | Crane Services
Bucket Truck Rentals | Building Moving | Church Steeple Washing
Equipment Moving | Storage Container Rentals | Storage Trailer Rentals
Towing Service | Other Services | Photos Pages | Related Links | Webrings Page

COPYRIGHT © LICENSED SINCE 2006 A&M CRANE & RIGGING
ALL RIGHTS RESERVED

Website Design By safety911web.com