
|

Photos of Lifting A Race Car Onto A Building



Tim Nall and his crew continue setting up a large crane to lift a
race car and set it into position on top of a building.



Tim Nall preparing to raise the boom on a large crane.



The boom is being raised on the crane.



Tim Nall in the cab of the crane, raising the boom.



The boom has been raised on the crane.



Tim Nall, owner and operator of A&M Crane & Rigging,
prepares to set up the rigging to lift the Lowes # 48 car.



Tim Nall and a crew member attaching the rigging to the race car.



Tim Nall and a crew member attaching the rigging to the race car.






The rigging is in place, and the race car is ready to be lifted.






|

|

|